Fenceline Status and update
Hi all,
As discussed at the 7/10/08 fenceline meeting at the refinery, the following items are to performed by Don G’s company ASAP:
- Get methane and mercaptin back on the FTIRs.
- Change the reported levels to PPB on the FTIRs.
- Provide thresholds for detection for FTIR Chems for modification (green boxes enabled) to the website.
- Send signal strength data to website from FTIRs. (old item)
- Get temperature data back to the website. Met tower to be erected.
Also, apparently the North FTIR has been NON-FUNCTIONAL for the past four days. Please advise.
Please make additions and corrections to the comments.
Thanks,
ET